R&R
• Capacity Expansion
• Timely generate expansion or build-up plan and align with factory team.
• Communicate with BU (in US) and Corporate (in KR) for the optimal support plan
• Actually execute support plan like transferring WW excess resources, purchasing / upgrading equipment
• Control schedule including re-layout activities and equipment arrival/release etc to meet target in time
• Layout Planning : Modify non-clean room space to clean room level, fully utilize limited space for production line.
• Factory system enhancement and data analysis : UPH / OEE / System
• Cost analysis : Collect each factors to analysis different case to charge customer cost adder
Key Performance
• Successfully to expand FCBGA/WLCSP/Test capacity for many times in Amkor
• Re-design the Capacity model and import the macro to improve the calculation time.
• Analyze data trend, verify and find the opportunity to improve the productivity
• Build up the log analysis instead of measuring UPH by stopwatch
• Compare the parameter and analysis it to improve the UPH
• Build the Cost Analysis Function